Joint Water Districts Board SCADA

Client: Joint Water Districs Board

Funder: Joint Water Districts Board

Location: Gridley, CA

Date: 2010 - present

In 1957, Richvale Irrigation District (RID), Biggs-West Gridley Water District (BWGWD), Butte Water District (BWD), and Sutter Extension Water District (SEWD) organized to form the Joint Water Districts Board (Joint Districts) to coordinate their efforts in managing the former Sutter Butte Canal Company distribution system of which they all shared a portion. Because of the interconnectivity of the individual districts’ water supplies, monitoring and communication of water diversions and divisions is critical and historically time intensive due the size of the Joint Districts service area (over 120,000 acres).

Starting in 2010, Davids Engineering has worked with the Joint Districts to install and manage a Supervisory Control and Data Acquisition (SCADA) system. The SCADA system initially included flow and level measurement at key existing monitoring sites within the shared portion of the distribution system, and has been progressively expanded to include new sites – both in the shared distribution system and in each district’s individual service area – and new site types – including pumping plants and automated canal gates. The SCADA system includes remote access and control to the sites, data archiving, robust user management, and mobile alarming, and Davids Engineering continues to closely support and expand this critical system.

All Projects

Madera Subbasin Groundwater Sustainability Plan Revisions 

Chowchilla Subbasin Groundwater Sustainability Plan Revisions

Moore Siphon Replacement Project

Dos Rios Ranch SB88 Compliance and Crop Planning Analysis

Hart Ranch On-Farm Irrigation Efficiency Improvements

Orland Project Distribution System Modernization

Water Management Plan Compliance Mapping

Agricultural Development Feasibility Assessment

Analysis of Effects of Water Management on Evapotranspiration from Managed Wetlands

Garden Highway Mutual Water Company Water Control Projects

Richvale Irrigation District Phase I Infrastructure Modernization

Joint Water Districts Board SCADA

Sutter Mutual Water Company Modernization Support

Shasta Valley Groundwater Monitoring

Time Series Evapotranspiration and Applied Water Estimates from Remote Sensing

Customer Delivery Measurement Data Collection and Accounting (RemoteTracker Implementation)

SGMA Technical Support Services and Prop 1 Stressed Basin Grant Project

Efficiency Conservation Definite Plan and Conservation Program

Boundary Outflow Measurements

Oakdale Irrigation District Agricultural Water Management Plan

Yuba Water Agency Agricultural Water Managment Plan

Feather River Agricultural Water Management Plan (FRRAWMP)

Colusa Subbasin Groundwater Sustainability Plan Development

Madera and Chowchilla Subbasins Groundwater Sustainability Plans

2022 Verification Project for Madera County GSAs

Little Shasta River Efficiency Study

Mill Creek Flow Measurement Improvements

Kettle Spring Improvement Project

Antelope Creek Fish Passage Improvement Project

Conservation Planning and Operations Decision Support