Richvale Irrigation District Phase I Infrastructure Modernization

Client: Richvale Irrigation District

Funder: USBR, DWR

Location: Richvale, CA

Date: 2017 - Present

Davids Engineering is providing engineering design, construction management, flow measurement, supervisory control and data acquisition (SCADA) design and integration, and administrative support for Richvale Irrigation District’s (RID) in progress Phase I Infrastructre Modernization project. The project is part of RID’s comprehensive plan for system modernization and boundary flow monitoring developed as part of the 2014 Feather River Regional Agricultural Water Management Plan (FRRAWMP), which was updated for RID’s service area in 2015.

Elements of the project include the following:

•Retrofit nine existing check structures for automated water level control by installation of electrically actuated slide gates, water level and gate sensors, and on-site programmable logic controllers (PLCs)

•Flow measurement at four primary lateral division points by installation and calibration of open channel acoustic doppler velocimeters.

•Remote control and monitoring of automated water level and flow measurement sites by implementation of a new SCADA system.

The project will improve delivery flexibility and steadiness for 132 delivery turnouts serving approximately 40 percent of RID’s irrigated area and will reduce operational spillage farm deliveries through increased efficiency.

All Projects

Colusa Subbasin Groundwater Sustainability Plan Revisions

Madera Subbasin Groundwater Sustainability Plan Revisions 

Chowchilla Subbasin Groundwater Sustainability Plan Revisions

Moore Siphon Replacement Project

Dos Rios Ranch SB88 Compliance and Crop Planning Analysis

Hart Ranch On-Farm Irrigation Efficiency Improvements

Orland Project Distribution System Modernization

Water Management Plan Compliance Mapping

Agricultural Development Feasibility Assessment

Analysis of Effects of Water Management on Evapotranspiration from Managed Wetlands

Garden Highway Mutual Water Company Water Control Projects

Richvale Irrigation District Phase I Infrastructure Modernization

Joint Water Districts Board SCADA

Sutter Mutual Water Company Modernization Support

Shasta Valley Groundwater Monitoring

Time Series Evapotranspiration and Applied Water Estimates from Remote Sensing

Customer Delivery Measurement Data Collection and Accounting (RemoteTracker Implementation)

SGMA Technical Support Services and Prop 1 Stressed Basin Grant Project

Efficiency Conservation Definite Plan and Conservation Program

Boundary Outflow Measurements

Oakdale Irrigation District Agricultural Water Management Plan

Yuba Water Agency Agricultural Water Managment Plan

Feather River Agricultural Water Management Plan (FRRAWMP)

Colusa Subbasin Groundwater Sustainability Plan Development

Madera and Chowchilla Subbasins Groundwater Sustainability Plans

2022 Verification Project for Madera County GSAs

Little Shasta River Efficiency Study

Mill Creek Flow Measurement Improvements

Kettle Spring Improvement Project

Antelope Creek Fish Passage Improvement Project

Conservation Planning and Operations Decision Support